Introduction
St. Vladimir Church, a longstanding parish serving the Parma, Ohio community since 1957, required a durable roof maintenance solution in 2025. West Roofing Systems returned to the site — having installed the original spray foam roof in 1993 and a first recoat in 2003 — to perform a roof recoat system that would extend the service life of the existing roof while addressing internal drainage challenges.

Project Overview
- Project Year: 2025
- Location: Parma, Ohio
- Roof Size: Approximately 10,000 sq ft
- System Installed: Acrylic recoat over existing coating
- Manufacturer: Sherwin-Williams
- Warranty: 10-Year Full System, Non-Prorated, No-Dollar-Limit, Renewable contractor warranty
Project Challenges
- The roof had been recoated in 2003 and required a high-performance recoating system to protect the substrate.
- The building’s internal gutter system was contributing to ponding and water retention, requiring improved slope and coating work.
- Since the roof system had work performed in prior decades, the recoating solution had to be compatible with existing materials to avoid a full tear-off.

Our Solution
West Roofing Systems selected a high-solids acrylic roof recoat system by Sherwin-Williams to provide renewed protection over the decades-old coating. The process included:
- Adjusting the slope of the internal gutter system to enhance water drainage and reduce ponding.
- Preparing and cleaning the existing roof surface to ensure product adhesion.
- Applying an acrylic base coat and intermediate coat to refresh the roof field.
- Installing a tinted topcoat to provide a glossy, long-lasting finish.
- Using a total dry mil thickness of approximately 20 mils for optimal durability and weather resistance.
Warranty & Protection
The completed system was backed by a 10-year, non-prorated, no-dollar-limit, renewable full-system warranty, giving St. Vladimir Church long-term confidence in the roof’s performance.
Results & Benefits
- Extended Roof Life: The acrylic recoat refreshes the waterproofing and extends the roof’s service life.
- Improved Drainage: Adjusting the internal gutter slope significantly reduced ponding water.
- Cost-Effective Solution: A full tear-off wasn’t required, saving the parish substantial cost and disruption.
- Warranty Protection: The 10-year full-system warranty provides peace of mind and can be renewed as needed.
Want to see the scope-of-work and before/after photos? View the PDF below
📄 View the St. Vladimir Church Case Study (PDF)
Need a free quote?
Is your building showing signs of aged coating, ponding, or maintenance issues? Recoating your roof might be the most cost-effective way to extend its life without a full replacement.
👉 Contact West Roofing Systems today for a professional assessment and tailored solution.