Introduction
Landmark Recovery in Tennessee needed a durable, high-performance roof system to replace their failing membrane. West Roofing Systems applied a combination of spray polyurethane foam (SPF) and silicone coatings to deliver a seamless, watertight roof backed by a long-term warranty.

Project Challenges
- Failing existing membrane with leaks and compromised integrity
- Roof surface irregularities needing smoothing and leveling
- Maintaining facility operations during the roofing process
- Need for a solution with long-term durability and minimal maintenance
Our Solution
- Removed and prepared the existing roof substrate
- Applied spray foam to build up a uniform, solid base
- Over the foam, installed a silicone coating system (base + topcoat)
- Embedded protective granules into the topcoat for added UV resistance and durability
- Ensured transitions and penetrations were sealed and waterproofed

Warranty Coverage
- 20-year full-system, No Dollar Limit, non-prorated warranty issued
Results & Benefits
- Seamless, monolithic roof system eliminated leak points
- Improved insulation and energy efficiency
- Extended roof life without full tear-off
- The roof is easy to maintain
- Strong warranty provides long-term peace of mind
Want to learn more details? And see more before, in-progress, and after photos?
📄 View the Landmark Recovery (TN) Full Project Profile (PDF)
Need a free roof quote?
Is your roof struggling with leaks or nearing end-of-life? Contact West Roofing Systems to explore our spray foam + silicone coating solutions — proven, durable, and backed by warranties.