Introduction
MTD entrusted West Roofing Systems to restore its 384,000 sq ft metal roof. What made this job unique: instead of a standard manual application, three spray-foam robots worked together to apply 2.5″ of closed-cell SPF in a single pass.
The project was completed in 52 days by a 14-person crew, delivering a high-performance, energy-efficient roof backed by a 20-year full-system warranty.

Project Challenges
- Massive roof size: 384,000 sq ft of metal requiring restoration
- Tight schedule: needed to complete the work in 52 days
- Safety concerns: potential overspray when using high-output robotic sprayers
- Temperature fluctuations: ambient weather changed drastically during installation, affecting foam behavior
- Maintaining building operations and ground-level safety during installation
Our Solution
- Pilot Test
- Before committing to the whole roof, West Roofing tested a 16,000 sq ft section with 2.5″ of SPF over five years. The performance met expectations, giving MTD confidence to move forward.
- Before committing to the whole roof, West Roofing tested a 16,000 sq ft section with 2.5″ of SPF over five years. The performance met expectations, giving MTD confidence to move forward.
- Robotic Foam Application
- Deployed 3 spray-foam robots to apply PremiSEAL 60R in a single continuous pass.
- A 14-person crew worked in tandem, averaging ~7,384 sq ft/day to hit the 52-day timeline.
- To manage overspray risks, custom foam-blocking skirts were used on the robots. Hand-held wind screens were used during windy periods.
- Coating & Finishing
- After foam application, they installed 30 mil SeamlesSEAL ULTRA HS silicone coating over the foam for UV protection and waterproofing.
- Completed the system with metal edge flashing, new gutters, downspouts, and rake edges.
Warranty & Protection
- The entire restored system is backed by a 20-year manufacturer’s total system warranty.
- Added insulation value: the new roof provides R-28 (more than double the previous R-value).

Results & Benefits
- Speed & Efficiency: Using a robotic application enabled the roof to be completed in under two months.
- Thermal Performance: With 2.5″ of SPF, MTD got a high R-value roof (~R-28), reducing energy costs.
- Cost Savings & Sustainability: Instead of tearing off the metal roof (and generating scrap), this restoration reused the substrate, minimizing waste.
- Quality & Safety Control: Daily quality checks, a safety checklist, and onsite QC/CRFC inspections kept the job tight.
Want to see the scope of work and before, in-progress, and finished photos? View the PDF:
📄 View the MTD Full Project Profile (PDF)
Need a free commercial roofing quote?
Do you have a large industrial or commercial roof that seems too big or complex for traditional restoration? Our robotic spray foam solutions can help — fast, efficient, and backed by long-term warranties.
👉 Contact West Roofing Systems to discuss your project or get a free assessment.